We wanted to share the amazing transformation completed by the Sports Interiors team at Cedar Point Country Club located in Suffolk, VA. The project work included installing our reflective Liner System on the ceiling, gable walls, and end walls of the two-court facility as well as painting of the steel beams in order to aesthetically enhance the area.
The Sports Interiors team began by painting the steel beams that would be visible following our Liner installation and this process included a meticulously coordinated plan to ensure that the club remained clean and untouched by the paint work. Once the painting was completed, the Liner installation began and our crew was able to complete the work ahead of schedule. The facility's unique design allowed the club to create a viewing deck at the rear of the tennis courts, and though this space provided some logistical challenges regarding the Liner installation, the end result proved to be fantastic. As you can see from the photos, the facility looks brand new, and we are proud to have played a part in enhancing the indoor tennis experience for its members and staff.
To further showcase the difference our systems can have to an indoor tennis court space, take a look at the photos taken during the ongoing work. The left shows how the club originally looked and the right shows the immediate impact our systems can have.
Mike Aliff, Cedar Point Country Club Board Member commented, “Cameron Robinett, CPCC President and I went through the facility today and you are correct. The finished system looks amazing! Elmer Camarena and his crew performed outstanding. The working relationship with them and Jan Talian was professional and corporative. Your team hit the ground running and the first week on site is an excellent example of delivering a quality product with a trained, experienced staff. A special “hats off/well done” to them. In my contract development with Dan, CPCC made the decision to provide SI the entire building in the hope that this would maximize your productivity and provide plenty of laydown area for your operations. Feel this is a win-win for both CPCC and SI in the ability to complete a quality job in 14 calander days. Thank you Sports Interiors for bringing our indoor courts “back to life!”
To learn more about how your facility can benefit from our systems, be sure to get in touch with us by clicking the contact us button below.